Take advantage of all the possibilities of your workload plan, to manage your activity with dexterity: management of resources, schedule and employees.
Managing a project requires great analytical skills. However, not all companies have the time to check all the data related to the project! It is at this stage that the workload plan comes into play, ensuring the monitoring and management of the project.
With this operational tool, you limit errors. A good thing for any project, when you know that only one can have irreversible consequences on the profitability of a business.
‍
A load plan is defined as an operational tool. It is managed by operations managers, staffing managers, as well as project managers/managers.
‍
Its objective is to provide visibility on various concrete criteria:
As said before, a load plan pilot your company's project. Its poor management, the lack of visibility of collaborators, or the lack of data cross-referencing are responsible for a slowdown in project management. As a result, 2 main issues stand out around load plan.
‍
‍
Project management is a real headache. It must ensure perfect cohesion between:
‍
Staffing managers “play with fire” when making tough decisions. Having all the information necessary for major decision-making is essential for the continuation of the project.
The challenge of the workload plan is to be an important instrument for managing the activity of managers. It measures the exact loads at the mesh of each project, as well as at the company mesh. Accompanied by this tool, decision-making is more relevant, but above all ensures more profitable decisions for the company.
‍
‍
This is where the second challenge comes in: foresight. Staffing managers have no choice but to set up concrete scenarios to ensure the continuity of all projects. Thus, using the load plan tool, they set up dynamic reports in order to analyze future needs.
‍
The objective? That financial, material and human needs are covered throughout the project. At the end of the project, the effectiveness of load plan depends on the results obtained. Studying the difference, between the simulated and the real, makes it possible to correct the situation for future projects.
Anticipating the project makes it possible to estimate the turnover and profits generated by the teams, to limit human errors and to readjust project management at all levels (decision-making, distribution of missions, recruitment, leave, etc.).
‍
‍
Your load plan is an operational tool which brings numerous benefits to everyone involved in the project. It allows you to have 360 visibility on:
‍
‍
‍
‍
‍
‍
The load plan is your most faithful tool. Unlike a CRM or ERP, you gather data on a single platform. You save precious time thanks to this powerful tool. You manage your projects with a high visibility of future opportunities, while consolidating your network of collaborators.
Your tool for load plan is in charge of cultivating the data. All you have to do is use them to manage all your projects brilliantly!